Leachate treatment plant in Thanh Hoa, capacity 100 m3/day and night

1. Scope of work

  • Detailed construction design, technology
  • Technical supervision of construction, supply and installation of equipment for the Treatment Plant
  • Test operation for the system to meet output standards type B according to QCVN40/2011
  • Prepare working procedures and training for the investor’s operating staff
  • Support the investor to explain the technical plan to relevant departments/ministries (if necessary)

2. System requirement data

Capacity: 100 m3/day.night

Wastewater treatment system meets discharge standards in Thanh Hoa

Composition and characteristics of input wastewater

STTParameterUnitValue
1pH3.0 – 5.0
2Suspended solidsmg/l154800
2BODmg/l14400
3pCODmg/l51100
4sCODmg/l24000
5NH4+mg/l975
6NO3-mg/l<0.01
7TKNmg/l1118
8TPmg/l10

Output requirements:

STTParameterUnitC value
B1B2
1pH6 – 86 – 8
2BOD5 (20oC)mg/l10050
3CODmg/l400300
4Total Nitrogenmg/l6060
5Amonimg/l2525

3. Leachate treatment plan in Thanh Hoa

First, the wastewater will be pre-treated by a pre-treatment system including Fenton oxidation and 2-stage flocculation. Next, the wastewater will be completely treated by RO Rochem technology from Germany, installed by TVTS

TVTS technician checks system operating pressure

4. Results of leachate treatment using RO ROCHEM technology

  • Wastewater after treatment meets customer requirements
  • The system operates stably, is periodically checked by TVTS technicians
  • The factory staff is well trained, instructed and trained to operate to meet job requirements